Roofing contractors in north and central New Jersey
Split levels, knee-wall attics, and a fair number of roofs carrying a layer nobody has looked under in years. The shingle is the least interesting line on the estimate.
Ask how many layers
Plenty of houses around here are carrying a second layer of shingle that went on instead of a tear-off, years ago. It matters to the price twice over: it doubles what has to come off, and it means nobody has actually seen the deck in a very long time. If a quote does not say how many layers it assumes, the number is provisional whether it admits that or not.
Split-level rooflines are the other local wrinkle. Where a lower roof runs into an upper wall there is a flashing detail that has to be cut in properly, and on a house with two or three of those junctions it is a real share of the labor. Worth asking whether each one is being redone or worked around.
Beyond that, the ordinary things. A stated price per sheet for decking. A count. And a name attached to the workmanship, not only to the shingle.
- 1 Ridge caps. Thin, exposed, and the first course to lift.
- 2 The field. The course you can see, over the underlayment you cannot.
- 3 Valleys. Leaf load mats where two slopes drain as one.
- 4 Flashing. Old masonry, and the wall an attached house shares.
- 5 Vent boots. The rubber cracks years before the shingles around it are done.
- 6 Eaves and ice dams. Where the melt runs out of warm roof and turns back into ice.
The work
Why roofs fail in this region
A winter that crosses the freezing point dozens of times rather than settling below it. Post-war Capes and split-levels with rooms built into the attic, so there is no ordinary space left to ventilate. A second layer of shingles that the state tolerated for years and a great many houses accepted. Skylights and dormers added in the 1980s and 1990s, each one a hole surrounded by flashing. And a roof edge that takes every drop of water the roof sheds. Most of what gets reported here traces back to one of those.